Please take a look below at a selection of recent projects we are proud to have completed and showcased within our community.”

Legacy Cove

JB&L completed complete site-development for this up and coming housing development in Decatur, Alabama. Over 60,000 yards of dirt were removed and hauled. Services JB&L provided inluded sewer, storm, utility, curb, gutter, and asphalt. ​

DLS 7

JB&L completed site work and excavation for a 35+ foot deep sewer wet well structure as part of DLS 7, supporting Decatur’s growing infrastructure needs.

Johnston St.

JB&L completed site development for this multiple-purpose business and entertainment district in downtown Decatur, Alabama. 

First Solar Wet Well / Force Main / Water Main

JB&L completed excavation of a 40+ foot deep sewer wet well, force main sewer installation, and water main extensions in preparation for the $1.1 billion First Solar development in Trinity, Alabama.

Elkmont Pump Station

JB&L completed grading and excavation for a new sewer pump station installation in Elkmont to support the new Elkmont High School development.

Alabama Department of Forensic Sciences

JB&L completed site preparation, sanitary sewer installation, storm drainage infrastructure, and grading for a new Alabama Department of Forensic Sciences facility off Technology Drive in Huntsville, Alabama.

LivSmart Hotel

JB&L completed site work for the new LivSmart Studios by Hilton hotel development in Decatur.

Fairgrounds

JB&L completed site work for a new warehouse park development, including building pads, roadway construction, sewer, storm drainage, and water main extensions.

Perry Pond

JB&L repaired a leaking pond through excavation and re-coring of the dam, followed by installation of a bentonite liner system for long-term stabilization.

Darlington Estate

JB&L completed site preparation for a custom residential home build in Huntsville, Alabama.

Sludge Thickener

JB&L completed excavation for a new clarifier as part of a plant expansion, including comprehensive site grading and preparation.

Bloom Winery

JB&L completed parking lot expansion to accommodate increased traffic and improve site accessibility.

Zaragoza Grocery

JB&L completed full site preparation for a new supermarket development, including sewer, storm drainage, water infrastructure, and mass grading.

Love Branch 

JB&L completed construction of a new wastewater treatment plant from the ground up in Harvest, Alabama, designed to support the area’s rapid growth and development.

Ardmore Water Install

JB&L completed site preparation for the expansion of an existing wastewater treatment plant, including demolition, excavation for new structures, and installation of a new water main along Jones Avenue to service the facility.